Project Detail:
Taliha Graphite Deposit over an area 496 ha in Village Taliha, Upper Subansiri district, Arunachal Pradesh for Production of Graphite 410879 TPA (ROM), 82201.99 TPA top soil, 358926.45 TPA (OB/SB/IB), Total Excavation 852007.4 TPA. Setting up of five mobile crushers at pit mouth with capacity of 100 t/h each to
crush the mineralized material to <80 mm size
The project envisages Production of Graphite 410879 TPA (ROM), 82201.99 TPA top soil, 358926.45 TPA (OB/SB/IB), Total Excavation 852007.4 TPA & Setting up of five mobile crushers at pit mouth with capacity of 100 t/h each to crush the mineralized material to <80 mm size.
The estimated project cost is Rs. 7882 lakhs. Life of the mine under the present proposal is 12 years.