Subscription

Private SectorProject Information Greenko TS02 Off-Stream Closed Loop Pumped Storage project (OCPSP). INR 6614.15 Cr INR 66.14 Bn
13-Aug-2022
PID : 54873 Telangana-India

Project Detail:

The proposed scheme involves construction of Rock fill embankments of average height of around 31m with maximum of 54m height in upper reservoir and average height of around 19m with maximum of 34m in lower reservoir with 0.678 TMC & 0.681TMC live storage capacity upper & lower reservoir respectively. 41.4m high Power Intake Structure 4 nos. each of 700.37m long and 7.0m dia. surface circular steel lined Penstock / Pressure Shaft out of which 3 nos. will feed 3 units of 300 MW and one no. of 700.37m long 7.0m dia. Surface circular steel lined Penstock / Pressure Shaft which will get bifurcated into 2 nos. near power house each of 74.08m long and 4.9m dia. will feed 2 units of 150MW.Three vertical-axis reversible Francis type units composed each of a generator/motor and a pump/turbine having generating/pumping capacity of 300MW / 330MW respectively and two vertical-axis reversible Francis type units composed each of a generator/motor and a pump/turbine having generating/pumping capacity of 150MW / 165MW respectively. As such, the proposed project will generate 1200 MW by utilizing a design discharge of 214.05 Cumec and
rated head of 157.00 m.
GEPL envisages to complete the construction of project within a period of three years at an estimated cost of INR 6614.15 Crores.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top