Project Detail:
Proposed Expansion of Daroli Limestone Mine-1 (from 1.64 Million Tons Per Annum (MTPA) to 4.53 MTPA (Total Excavation) (Limestone- 4.10MTPA,Over burden & Soil- 0.43 MTPA,) and Expansion of crusher capacity by installing additional crusher. Existing- 700 TPH, Proposed capacity 2070 TPH Total Capacity 2770 TPH with increase in length from existing crusher location to proposed additional crusher within lease area(approx-5.0 km) within existing lease area
Total Cost After Expansion: 271.585 Crores
Note: Please Download Project Document attached to this Project for more information.
|