Project Detail:
The project has been proposed for mining of 16000 TPA (Soapstone) & 15200 TPA (Dolomite) by underground Method. The lease area is 156.31 ha. Total minable reserve available is 10273389 MT. The expected life of mine is 36 years. Total OB/waste generated during the plan period of the mine will be 88465.31 tons. The mineral will be transported through trucks/ tippers.
Water requirement will be 22.5 KLD for the project and will be met by water tanker supply & store water in mine pits. Ground water table will not be intersected during the scheme period / conceptual phase.
The project cost will be Rs. 10 Crore.