Project Detail:
Proposed project is a new installation of 160.0 KLPD molasses/ Grain based distillery. Proposed unit is based two modes of operation, first (mode – 1) will be 100.0 % molasses based operation for 160.0 KLD or second (mode – 2) will be 120.0 KLD on molasses based along with 40.0 KLD on grain based. Proposed unit will be run on single mode at a time, either on mode -1 or mode -2. Molasses is a by-product from the sugar industry which will be used as raw material in
the proposed new distillery and in grain based operation broken rice / maize / corn etc. will be used as raw material.
Total estimated cost for the project will be Rs 20000.0 Lakhs.
Note: Please Download Project Document attached to this Project for more information.
|