Project Detail:
Proposed new Manufacturing unit of Different Grades of Carbon Black (Production Capacity: 1.925 Lakh Tonne/Annum) and 36 MW Waste Heat Recovery based Cogeneration Captive Power plant(In Tor Application: Production capacity is 2.60 Lakh Tonne /Annum and Captive Power plant is 50 MW)
planned to set up a unit in SIPCOT industrial park, Thervoy Kandigai. Proposed facility will be located at Plot No A7 of Thervoy kandigai Village, Tamil Nadu. The allotted land area is 60.02 Acres (242892.32 Sq.m). The land allotted from SIPCOT industrial complex to the proponent for this proposed project.
The estimated project cost is Rs. 615 Crores.