Project Detail:
Taking into consideration the growing medical needs of the people of due to COVID 19, the Semi Permanent/Temporary ICU Hospital is planned admeasuring an area of 2.5 Acres. The construction has been conceptualized on a vacant (green field) site within the residential zone of Sultanpuri, New Delhi.
The proposed construction works to be taken up are as follows:
A) Hospital
B) Development of Internal roads
C) Utilities/Services like Water Supply, Sewerage and Drainage system
D) Construction of Rainwater Harvesting Structures and Pits
E) Power supply and back up facility
The total cost of the proposed project is Rs.124.26 Crores.
Note: Please Download Project Document attached to this Project for more information.
|