Project Detail:
The company has proposes change in technology from 1.2 MTPA Dry to 1.2 MTPA Wet Type of Coal Washery without change in production capacity at Beltara village, Bilha tehsil, Bilaspur district, Chhattisgarh state.The existing coal washery production capacity is 1.2 MTPA which is located in an area of 6.08 ha.
Estimated project cost and along with analysis in terms of economic viability of the project: Cost of operating project with dry technology is about Rs. 4.5 Crores. Estimated cost for proposed modernisation will be about Rs. 10 Crores.
Note: Please Download Project Document attached to this Project for more information.
|