Project detail:
B.S. Sponge Pvt.Ltd. is operating Steel plant at Taraimal Village, Tamnar Tehsil, Raigarh District, Chhattisgarh. Existing plant has obtained Environment Clearance from MoEF&CC vide F.No. J-11011/313/2008 -IA II (I) dt. 1stJanuary 2009 & 12thAugust 2016 (Validity Extension). Accordingly obtained Consent to Establish and Consent to Operate from the Chhattisgarh Environment Conservation Board (CECB) vide order no. 4478/TS/CECB/2019 dated 28/08/2019 which is Valid upto 31/08/2022 (A copy of CTO is enclosed as ANNEXURE # 13). Recently CTE has been issued by CECB for up gradation of WHRB power plant from 12 MW to 18 MW & 4.0 MW FBC based Power plant vide order no.10876 / TS / CECB / 2020, Naya Raipur
Now as part of expansion, company proposed to the steel plant i.e. DRI Kilns (Sponge Iron from 1,80,000 TPA to 6,75,000 TPA), Induction Furnace with matching LRF & CCM (MS Billets / Ingots from 1,20,000 TPA to 5,16,000TPA), Rolling Mill (Rolled Products from 1,05,000 TPA to 4,35,000 TPA, with 2 x 10,000 NM3/Hr Coal Gasifier), Mini Rolling Mill with Coal Gasifier (33,000 TPAwith 1 x 2000 NM3/Hr.), New Ferro Alloy Unit 2 x 9 MVA (FeMn 45,000 TPA/SiMn 30,000 TPA / FeSi 15,000 TPA / FeCr 30,000 TPA), WHRB based Power Plant from 18 MW to 48 MW, FBC based Power Plant 4 MW to 34 MW, New Fly Ash brick manufacturing unit (80,000 Bricks/day) & Slag Crusher & Beneficiation Unit (66,000 TPA).
Existing plant is located in 36.43 Ha. (90.00 acres) of land. Proposed expansion will be taken up in existing plant and 7.31 Ha. (18.06 acres) of land adjacent to the existing plant. Total land after proposed expansion will be 43.74 Ha. (108.06 acres).
The estimated project cost for the proposed expansion project is Rs. 384 Crores
Note: please download project document attached to this project for more information.
|