Project Detail:
The proposed project comprises of following three components:
Construction of 4 Lane approach road from Numaligarh side to Start of Brahmaputra River Tunnel on South Bank, Package – I, from Ch. 26+700 to Ch. 34+664 (Design Length 7.964 km) in the State of Assam under SARDP – NE on EPC mode.
Construction of 4 Lane approach road from End of Brahmaputra River Tunnel to Gohpur side on North Bank, Package – III, from Ch. 0+000 to Ch. 11+100 (Design Length 11.100 km) in the State of Assam under SARDP – NE on EPC mode.
Construction of Twin Tube TM Road Tunnel of 2 Lane each under River Brahmaputra, Package – II, from Ch. 11+100 to Ch. 26+700 (Design Length 15.600 km) in the State of Assam under SARDP – NE on EPC mode.
The estimated overall cost for the proposed project inclusive of civil & engineering aspect is Rs. 11204.42 Crores.
The overall cost of the Project, the civil works are expected to cost INR Total Project cost is 11204.42 crore for proposed project. The Environmental Management Plan (EMP) is proposed for the mitigation of adverse impacts and enhances the positive impacts. The tentative EMP budgetary provision has been made with a cost of INR 72.24 lacs.
It is proposed that the project will be commissioned after 48 months from grant of EC and other statutory approvals.