2×21MW (OC) = 42MW Gas Based Thermal Power Project.
|
INR 176.02 Cr
INR 1.76 Bn
|
29-Nov-2019
|
PID : 28504
Tripura-India
|
Project Detail:
Production and Manufacturing Process: 2 x 21 MW gas based thermal power plant has been using gas (locally available ONGC & GAIL GGS) as a fuel. Fresh air enters the Compressor at ambient temperature where its pressure and temperature are increased. The high pressure air enters the Combustion Chamber where the natural gas is burnt at constant pressure. The high temperature (and pressure) gas enters the Gas Turbine where it expands to ambient pressure and produces electricity, which is then supplied to the grid through high-voltage power lines.
Land requirement: 65.77 acres or 26 ha of forest land has been taken by TSECL for running this project i.e. for industrial use.
Total project cost: 176.02 Cr.
Note: Please Download Project Document attached to this Project for more information.
|
|
Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.