Filter

Projects for "Roads"

Filter
Description Value Updated Date
1. Roads, Civil Works Projects Strengthening Institutional Capacity of the Assam Public Works (Roads) Department in Climate Change and Disaster Resilience, and Road Asset Management. Refer Document
14-Mar-2024
PID : 65830 Assam Project
2. Road Transport Services, Roads, Civil Works, Safety Equipment\Explosives Projects Development of 8 Lane Spur Starting from Km 26.582 of Vadodara - Mumbai Expressway Main Alignment (Design Chainage 0+000) and Terminating at Proposed Junction with the Multi-Modal Corridor of MMRDA (Design Chainage 79+783) in the state of Maharashtra. INR 10510 Cr INR 105.10 Bn
20-Feb-2024
PID : 65789 Maharashtra Project
3. Roads, Bridges, Civil Works Projects Development of 6 Lane (Greenfield) Access Controlled Economic Corridor from Bengaluru – Kadappa – Vijayawada (BKV) Section: Package-II Start near Kothapalle Village (Design Ch. 160.000) and Ends near Uppalapadu Village (Design Ch. 226.000) in the State of Andhra Pradesh, Total Length - 66.000 km. INR 3460.17 Cr INR 34.60 Bn
16-Feb-2024
PID : 65784 Andhra Pradesh Project
4. Roads, Bridges, Civil Works Projects Development of 6 Lane (Greenfield) Access Controlled Economic Corridor from Bengaluru– Kadappa – Vijayawada (BKV) Section: Package III Starts at Uppalapadu village (Design Ch. 226. 000) and ends near Muppa varam village on NH -16 (Desi gn Ch. 342. 500 ) in the state of Andhra Pradesh Total Length – 116.500 km. INR 3460.17 Cr INR 34.60 Bn
07-Feb-2024
PID : 65767 Andhra Pradesh Project
5. Roads, Bridges, Civil Works Projects Development of 6 Lane (Greenfield) Access Controlled Economic Corridor from Bengaluru – Kadappa – Vijayawada (BKV) Section: Package-II Start Near Kothapalle Village (Design Ch. 160.000) and Ends Near Uppalapadu Village (Design Ch. 226.000) in the State o Andhra Pradesh, Total Length - 66.000 km. INR 130.95 Cr INR 1.30 Bn
06-Feb-2024
PID : 65765 Andhra Pradesh Project
6. Roads, Bridges, Civil Works Projects Development of 6 Lane (Greenfield) Access Controlled Economic Corridor from Bengaluru– Kadappa – Vijayawada (BKV) Section: Package-I Starts at Koduru Village on NH-44 (Design Ch. 0.000) and Ends near Kothapalle Village (Design Ch. 160.000) in the State of Andhra Pradesh (Total Length -160.000 km). INR 6167.05 Cr INR 61.67 Bn
06-Feb-2024
PID : 65766 Andhra Pradesh Project
7. Civil Works, Roads Projects Industrial Corridor Development Program (Subprogram 2). Refer Document
22-Dec-2023
PID : 65692 Multi State Project
8. Road Transport Services, Roads, Civil Works Projects Gujarat Rural Road Program. $ 8300 Cr $ 83 Bn
21-Dec-2023
PID : 65689 Gujarat Project
9. Roads, Civil Works Projects Strengthening Institutional Capacity of the Assam Public Works (Roads) Department in Climate Change and Disaster Resilience, and Road Asset Management. Refer Document
19-Dec-2023
PID : 65685 Assam Project
10. Drilling, Pipeline Project, Roads Projects Proposed Onshore Oil and Gas Development & Production in AA/ONDSF/HAZARIGAON/2018 Hydrocarbon Block. INR 120.40 Cr INR 1.20 Bn
26-Oct-2023
PID : 65601 Assam Project
  • Show
  • Projects
Description Value Updated Date
  • Show
  • Project Awards
Description Value Updated Date
  • Show
  • Project News
Description Date
  • Show
  • Exhibitions
  • Show
  • Vendors
Description Value Due Date
  • Show
  • Tenders
Top