Filter

Projects for "Iron"

Filter
Description Value Updated Date
1. Power Plant, Other Machinery, Iron Projects Greenfield Project for Production of Sponge Iron 1,15,500 TPA with 350 TPD DRI Kiln, Ferro Alloy Plant Product Mix of Silico Manganese (16,929 TPA) or Ferro Manganese (21,092 TPA) or Ferro Silicon (9,191 TPA) with 9 MVA Submerged Arc Furnace and WHRB based Captive Power Plant of8 MW at Mouza- Mondalpur, Jadudanga, PS+PO- Jamuria, Ranisayer -Jamuria Road. INR 230 Cr INR 2.30 Bn
02-Apr-2024
PID : 65860 West Bengal Project
2. Iron, Other Machinery Projects Project for 5.00 MTPA Iron Ore Processing Plant & 3.0 MTPA Pellet Plant over an area of 26.44 Ha, Integrated with Downhill Pipe Conveyor over an area of 16.58 Ha at Village Somalapura, Sandur Taluk, Tailing Area: 81.71 Ha at Kalingeri village, Sandur-Taluk. INR 1920 Cr INR 19.20 Bn
01-Apr-2024
PID : 65857 Karnataka Project
3. Chemicals, Chemical Machinery, Iron Projects Proposed Manufacturing of 2400 TPA of Manganese Oxide by Roasting and 2400 of TPA Ferro Manganese M.C./L.C, 80 TPA of Ferro Titanium or 80 TPA of Ferro Vanadium or 80 TPA of Ferro Molybdenum (By Thermite Process). INR 3 Cr INR 30 Mn
30-Mar-2024
PID : 65856 Maharashtra Project
4. Power Plant, Iron, Civil Works Projects Expansion of Steel Plant, Existing Sponge Iron & Power Plant by Installation of 1x350 TPD DRI kiln to Produce 90,000 TPA to 1,95,000 TPA of Sponge Iron with 6.0 MW to 14 MW WHRB Facility, 6.0 MW to 8.0 MW AFBC Power Plant, New Induction Furnaces of 4x30 T to produce 4,18,630 TPA of Billets & New Narrow Hot Strip Mill to produce H.R. Coils, Strips of 4,00,000 TPA. INR 400 Cr INR 4 Bn
02-Jan-2024
PID : 65709 Karnataka Project
5. Iron, Boiler and Heater, Other Electrical Products, Power Plant Projects Expansion of Proposed Iron Ore Pelletization Plant from 0.6 MTPA to 1.2 MTPA and 1.0 MTPA Iron Beneficiation Plant located at village - Anra, Tehsil – Telkoi. INR 286 Cr INR 2.86 Bn
29-Dec-2023
PID : 65703 Orissa (Odisha) Project
6. Boiler and Heater, Other Machinery, Iron, Power Plant Projects Installation of Additional 12 Mt Induction Furnace to Produce 36,000 Tpa Ms Billets, Activity Covered Under 3 (A) Metallurgical Industries. Existing Production Capacity Sponge Iron: 2 X 100 Tpd – 60,000 Tpa, Whrb – 2 X 3 Mw, Induction Furnace 12 Mt – 36,000 Tpa Ms Billets And Biomass Based Power Plant – 5 mw. INR 1.80 Cr INR 18.09 Mn
26-Dec-2023
PID : 65697 Chhattisgarh Project
7. Other Machinery, Iron, Civil Works Projects Expansion of Its Existing Facility by Installing an Additional Electric Induction Furnace of 1 X 15 Tph In Addition To Existing 1 X 15 Tph Electric induction Furnace, and Expansion of the Rolling Mill By Increasing Number of Strands By 10- Additional Nos to Produce Billets and Tmt Bars. M.S. Scrap Along With Sponge Iron Will Be Melted In Electric Induction Furnace, The Molten Metal Is Cast Into Billets, And The Billets Are... INR 14 Cr INR 140 Mn
12-Dec-2023
PID : 65673 Andhra Pradesh Project
8. Boiler and Heater, Other Machinery, Iron Projects Establishment of 1 x 9 MVA Ferro Alloys Plant (Silicon Manganese – 14400 TPA or Ferro Manganese - 25200 TPA or Ferro Chrome -15000 TPA or Ferro Silicon – 7000 TPA or Pig Iron – 25200 TPA) in Existing 7.5 MW Biomass Based Power Plant Premises (Forward Integration) in Existing Plant Premises]. INR 13 Cr INR 130 Mn
17-Nov-2023
PID : 65633 Chhattisgarh Project
9. Iron, Minerals, Mining Equipments, Other Machinery Projects Proposed Expansion of Production of Iron Ore from 12 MTPA to 19.5 MTPA (Rom) with Total Excavation of 22.94 MTPA, and Beneficiation Plant Throughput Capacity Increase From 12 MTPA to 17.6 MTPA in Joda East Iron Ore Mine within Ml Area of 671.093 Ha Located In The Villages Joda, Kamarjoda, Banspani, Khuntpani & Baitarani Reserve Forest (R.F) In Barbil Taluka. INR 1915 Cr INR 19.15 Bn
07-Nov-2023
PID : 65621 Orissa (Odisha) Project
10. Minerals, Iron, Stainless Steel Projects Guali Iron Ore Mine Total Excavation of 37.67 million TPA [Saleable Iron Ore-27.44 MTPA, Mineral Rejects-2.56 MTPA, Waste-7.48 MTPA, Topsoil-0.184 MTPA] along with 1x5000 TPH, 1x2500 TPH Stationary Multistage Crushing & Screening Plant in addition to existing 1x175 TPH, 1x200 TPH, 2x400 TPH Stationary Crusher plant, 1X150 TPH Mobile Crusher Plant, 1x150 TPH, 5x250 TPH Mobile Screening Plant and 1x1500 TPH Stationary Screening... INR 1020.63 Cr INR 10.20 Bn
30-Oct-2023
PID : 65607 Orissa (Odisha) Project
  • Show
  • Projects
Description Value Updated Date
  • Show
  • Project Awards
Description Value Updated Date
  • Show
  • Project News
Description Date
  • Show
  • Exhibitions
  • Show
  • Vendors
Description Value Due Date
  • Show
  • Tenders
Top